      · With the domestic leading supersonic HVOF plasma, Plasma spray coatings, automatic  high power, the supersonic electric arc three spraying technology

 

·The United States, the United States PRAXAIR Seattle spraying Miller plasma equipment to undertake thermal spraying processing

 

Project  performance  schedule

 

Part of project performance schedule

 

Gu                                          GuangZhou SANXIN Metal S&T Co., Ltd

 

Project performance schedule

 

 

 

  Serial number

user name

project name

date of the construction

Material

1

xinhuisuangshui power plant in guangdong

pot 480 T/H CFB with two water wall and economizer area of 400 M2 prevent grind

spraying in July 2006, August

SX-801

2

lianzhou power plant in guangdong

water wall spray application three times 250 M2 

in July 2006

SX-801

3

B plant sajiao guangdong power plant

import unit boiler air preheater sealing surface supersonic spraying alloy

in December 2001

SX-801

4

guangdong dongguan liwen paper mill plant

with two CFB boiler water-cooled wall etc new furnace four tube spraying 800 M2 

in October 2005

September 2006    

SX88A

5

 guangdong jiangmen the new thermal power Co., LTD

pot has 450 T/H? CFB new furnace spraying water wall 70 square meters  

in December 2005  

SX-601

6

guangdong dongguan jianhui paper Co., LTD.

 Jackie pot of 220 T/H? CFB spraying water wall 60 square metre

in February 2006  

SX-601

7

chongqing tianfu power plant

water wall (CFB) spraying 240 square meters

in May 2006,   

SX-801

8

jinxi petrochemical coal-fired power station

# 2 furnace water wall (CFB) spraying 180 square meters

in May 2006,

SX-801

9

 erzhou power plant

water wall (CFB) spraying 85 square meters

in June 2006

SX-601

10

the ningbozhonmao power plant   

# 3 in heating furnace (CFB) spraying 105 square meters

in July 2006     

SX-801

11

shandong xintai thermal power plant,

the 1 # furnace economizer (CFB) spraying 206 square meters

in July 2006

SX-801

12

Harbin huaneng power plant

# 2 furnace water wall (CFB) spraying 115 square meters  

in August 2006   

Sx-601

13

 sichuan leshan haihong power plant

2 # furnace water wall (CFB) spraying 193 square meters

 

in September 2006     

 

 

Sx-801

14

sichuan white horse CFB demonstration power plant

water wall painting 71 square meters  

in October 2006  

Sx-601

15

 ningxia coal group

heat exchanger water wall painting 730 square meters     

in November 2006  

Sx-601

16

 jiangxi province coal auspicious to limited liability company

above and water wall supersonic electric arc spraying 40 square meters

in July 2006

LX88A

广州三鑫金属科技有限公司 版权所有
技术支持 
建站中心
ICP备案号:粤ICP备09162056号


Warning: fopen(./index.html) [function.fopen]: failed to open stream: Permission denied in /home/www/wwwroot/web/eSitewww/sanxin086/includes/func/common.inc.php on line 364

Warning: fwrite(): supplied argument is not a valid stream resource in /home/www/wwwroot/web/eSitewww/sanxin086/includes/func/common.inc.php on line 365

Warning: fclose(): supplied argument is not a valid stream resource in /home/www/wwwroot/web/eSitewww/sanxin086/includes/func/common.inc.php on line 366